Boost Industrial Efficiency with BLE‑Powered Real‑Time Location Systems

What Is RTLS?

A real-time location system (RTLS) is a type of indoor positioning system that is gaining popularity in industries for improving efficiency, productivity, and safety. Using these systems, we can accurately track and locate assets and people inside industrial premises. RTLS is capable of achieving centimeter-level accuracy. Markets and Markets forecasts the RTLS market to grow from USD 3.186 million in 2018 to reach USD 8.792 million by 2023, at a compound annual growth rate of 22.5%.

Conventional GPS systems won’t provide accurate location information inside industrial premises due to the inability of GPS signals to penetrate through construction materials. GPS devices are much more costly, complex, and consume more power in comparison to Bluetooth Low Energy (BLE) technology. Depending on the data transmission and power consumption, the BLE tags can achieve a battery life of seven years.

Components of BLE-Based RTLS

An RTLS is comprised of BLE tags, BLE anchors, and BLE gateways with Wi-Fi connectivity and an edge computer to gather and analyze the received data.

BLE tags transmit BLE signals at definite intervals. The BLE tags come with multiple sensors built in, such as 3-axis accelerometers, temperature sensors, shock sensors, light sensors, and so on, for ambient condition monitoring.

BLE anchors receive the signal transmitted by BLE tags and calculate the RSSI value, angle of arrival (AoA), and angle of departure (AoD).

BLE gateways act as the master and collect information from associated BLE anchors. These gateway devices have Wi-Fi connectivity for communicating with the edge computer.

Why BLE-Based RTLS?

BLE-based RTLS gives better accuracy and is relatively cheap when compared with other existing technologies. Small coin-sized BLE tags are available that have a long battery life.

Item

Accuracy

Anti-Interference Performance

Power Usage

Data Rate

Coverage

Battery Life

Cost

Active RFID

Good

Good

Medium

Low

Good

Good

Medium

BLE (Bluetooth 5.1)

Very Good

Very Good

Low

Medium

Good

Excellent

Medium

Wi-Fi

Poor

Good

High

High

Very Good

Poor

High

ZigBee

Very Good

Very Good

High

High

Good

Average

High

UWB

Excellent

Excellent

Medium

Medium

Good

Good

Medium

GPS

Good

Good

Medium

NA

Excellent

Average

Very High

 

Architecture

BLE tags are attached to the personnel, forklifts, and assets that need to be tracked. The BLE tags will transfer signals along with the sensor data to the nearest anchors at a one-second (configurable) interval.

These data will be evaluated by the anchors based on the RSSI value, angle of arrival, and angle of departure. Anchors are always placed at fixed locations. They communicate with one another through mesh topology.

The data, along with the position coordinates of the tags, are transferred to the BLE and Wi-Fi gateways. The gateways further transfer the accumulated data to the edge computer. All positioning, AI, ML, and analytics will be run on the edge computer. The computer will also perform control/alarm actions, and it can present report dashboards and live monitoring maps.

Tags come with built-in push buttons that can be configured for intelligent access control to specified areas. This system can be integrated with the alarm management system and existing security cameras to improve security. Enabling cloud functionality to the edge computer will help the operator access the information remotely.

Boost Industrial Efficiency with BLE‑Powered Real‑Time Location SystemsDiagram of RTLS architecture

 

Social distance monitoring can also be achieved using this system. If two or more people come in contact, vibration/audio-based alerts can be sent to the respective tags. The vibration/audio alert will automatically reset once they start keeping the safe distance. All reports can be monitored through the respective web/mobile application developed.

Upon fully implementing RTLS, industries will benefit in the following ways:

RTLS Applications in Industries


Industrial Technology

  1. Industries Leading the Robotics Revolution
  2. Harnessing IoT to Boost Supply Chain Efficiency & Reduce Shipping Losses
  3. Technology’s Promise: Revolutionizing Agriculture and Food Production
  4. Maximize CNC Productivity with On‑Machine Probing: Faster, More Accurate Results
  5. Harnessing AI to Accelerate Renewable Energy Innovation
  6. Boost Manufacturing Efficiency: Proven Measurement & Improvement Strategies
  7. How Digital Innovation Drives Productivity in Modern Manufacturing
  8. Embrace Digital Transformation: How Industries Thrive in the New Tech Era
  9. Harnessing Digital Twin Technology to Boost Manufacturing Efficiency and Cost Savings
  10. Enhancing Laboratory Safety and Efficiency Through Optimized Gas Distribution