RAMPF Launches State‑of‑the‑Art Composite Facility in Ontario, Michigan
JEC Group reported on Oct. 29 that RAMPF Composite Solutions (Wixom, Mich., U.S.) has started operations in its new factory, located in Ontario, Mich. The 73,400-square-foot facility features state-of-the-art infrastructure for the production of premium carbon fiber and glass fiber composite parts for the aerospace, defense, industrial, medical, high-end consumer and green transportation industries.
“The size and layout of the new facility allow us to add equipment, further improve production processes and product quality and significantly reduce lead and delivery times,” comments Larry Fitzgerald, CEO of RAMPF Composite Solutions. “We can now explore the numerous opportunities in the rapidly growing field of lightweight composites more effectively. This new facility will allow us to take on larger projects, where previously we were limited with available space and capabilities.
The building encompasses:
- Large temperature-controlled lamination room in which both lamination and vacuum bagging are co-located to reduce processing lead times.
- New infusion vacuum pump system that further improves the control of the infusion process and reduces usage of nylon infusion tubing.
- Three large-capacity ovens that allow for curing of large, complex components.
- New dust-control system that provides for optimum air quality in CNC trimming operations.
- Co-location of machine shop allows for the quick-turn creation of tools, jigs, and fixtures for prototyping.
Operations in RAMPF Composite Solutions’ former facility, which is within close proximity of the new building, were discontinued in September 2020.
fiber
- U.S. Navy Launches Advanced P‑8A Poseidon Maintenance Training Facility
- United Airlines Opens $35 Million Newark Maintenance Hangar to Expand Wide‑Body Capabilities
- Markforged Expands with New 25,000‑sq‑ft Facility in Billerica, MA
- Revolutionizing Last‑Mile Delivery in 2024: Robotics, Collaboration, and Superior Customer Experience
- BFG Africa Launches State‑of‑the‑Art Composite Facility in Germiston, Boosting Africa’s FRP Production
- Quickstep Launches Advanced Flare Housing Facility for F-35 Lightning II
- Néos International Sets Up New UK HQ & State‑of‑the‑Art Composites Facility in Derby
- Bcomp Expands Operations with State‑of‑the‑Art Production Facility in Fribourg
- Fanuc Announces Grand Opening of New 461,000‑sq‑ft Robotics Hub in Auburn Hills, Michigan
- FANUC America Unveils 461,000‑sq‑ft Michigan Robotics Facility