DIY Ultrasonic Security System with Arduino – Real-Time Distance Detection
Components and supplies
![]() |
| × | 1 | |||
![]() |
| × | 1 | |||
![]() |
| × | 1 | |||
![]() |
| × | 1 | |||
![]() |
| × | 3 | |||
![]() |
| × | 1 | |||
![]() |
| × | 10 |
About this project
Step 1: Assemble Materials

Connect a red wire from the 5V pin on the Arduino to the positive channel of the breadboard. Connect a black wire from the GND pin on the Arduino to the negative channel of the breadboard:
- Buzzer = pin 7
On Ultrasonic Sensor:
- Echo = pin 3
- Trig = pin 2
LEDs:
- RedLED = pin 4
- YellowLED = pin 5
- GreenLED = pin 6
The green wires connected to the LEDs should be connected in line to the positive side of the LED, while the negative side of the LED should be connected to the negative channel of the breadboard using a 220 ohm resistor.
Step 3: Assembly - Breadboard
Firstly, let's connect the 5V and GND pin on the Arduino to the breadboard. As I mentioned before, be sure that the wire attached to the 5V pin is connected to the positive channel of the breadboard, and the wire attached to the GND pin is connected to the negative channel of the breadboard.
Step 4: Assembly - Ultrasonic Sensor
Time to connect the HC-SRO4 ultrasonic sensor! A great tip is to place the ultrasonic sensor as far right to the breadboard as possible and make sure that it is facing out. Referring back to the setup picture, you should connect the GND pin on the ultrasonic sensor to the negative channel on the breadboard. Next connect the Trig pin on the sensor to pin 2 on the Arduino and connect the Echo pin on the sensor to pin 3 on the Arduino. Lastly, connect the VCC pin on the ultrasonic sensor to the positive channel on the breadboard. Refer to the picture above if anything gets confusing.
Step 5: Assembly - LEDs
The next step is to connect the LED's to the breadboard and Arduino. If you need to, I highly recommend that you refer back to the setup picture (Step 2), attaching the LEDs is pretty easy, there's a lot of repetition. Let's first attach the Green LED. So the way to do this, is to connect the anode (the longer leg) to pin 6 on the Arduino with a green wire, and to connect the cathode (the shorter leg) to the negative channel on the breadboard, using a 220 ohm resistor. Then repeat that step for the Yellow and then the Red LED, make sure to connect the anode (the longer leg) of the yellow LED to pin 5 on the Arduino and then connect the anode of the red LED to pin 6. Once you have done that, your setup should look similar to the picture above.
Resistors are not absolutely necessary, however they are highly recommended to be used.
Step 6: Assembly - Buzzer
The last part of the setup for this, is connecting the buzzer to the breadboard and the Arduino. This is one of the easiest parts of the whole setup. All that is required to do is to connect the longer leg of the buzzer to pin 7 of the Arduino using a green wire and then connect the shorter leg of the buzzer to the negative channel of the breadboard using a 220 ohm resistor.
It is HIGHLY recommended to use a resistor in connecting the shorter leg of the buzzer to the negative channel of the breadboard. This greatly reduces the volume of the buzzer and prevent it from dying to quickly.
Code
- Ultrasonic Security System
Ultrasonic Security SystemArduino
#define trigPin 2
#define echoPin 3
#define LEDlampRed 4
#define LEDlampYellow 5
#define LEDlampGreen 6
#define soundbuzzer 7
int sound = 500;
void setup() {
Serial.begin (9600);
pinMode(trigPin, OUTPUT);
pinMode(echoPin, INPUT);
pinMode(LEDlampRed, OUTPUT);
pinMode(LEDlampYellow, OUTPUT);
pinMode(LEDlampGreen, OUTPUT);
pinMode(soundbuzzer, OUTPUT);
}
void loop() {
long durationindigit, distanceincm;
digitalWrite(trigPin, LOW);
delayMicroseconds(2);
digitalWrite(trigPin, HIGH);
delayMicroseconds(10);
digitalWrite(trigPin, LOW);
durationindigit = pulseIn(echoPin, HIGH);
distanceincm = (durationindigit/5) / 29.1;
if (distanceincm < 50) {
digitalWrite(LEDlampGreen, HIGH);
}
else {
digitalWrite(LEDlampGreen, LOW);
}
if (distance < 20) {
digitalWrite(LEDlampYellow, HIGH);
}
else {
digitalWrite(LEDlampYellow,LOW);
}
if (distance < 5) {
digitalWrite(LEDlampRed, HIGH);
sound = 1000;
}
else {
digitalWrite(LEDlampRed,LOW);
}
if (distanceincm > 5 || distanceinsm <= 0){
Serial.println("Outside the permissible range of distances");
noTone(soundbuzzer);
}
else {
Serial.print(distance);
Serial.println(" cm");
tone(buzzer, sound);
}
delay(300);
}
Schematics

Manufacturing process
- Arduino Digital Dice Project: Build Your Own LCD-based Random Number Generator
- Portable Range Detector – Arduino Nano DIY Kit with HC‑SR04, 18650 Power, and 3D‑Printed Enclosure
- Build a Smart Home Automation & Security System with 1Sheeld
- Copper Electroplating Project: Build a Smart System with Arduino UNO
- NeoPixel Matrix Pong on Arduino Nano: Build a Neon Pong Game
- Create Stunning Light Sequences with Arduino Shift Register
- Smart Plug: 120V Arduino‑Based Smart Outlet with Real‑Time Clock
- Arduino-Powered Security System: Smart Motion Detection & Alert
- Arduino Tennis Game – Build a Virtual Racquet Experience with NeoPixel, Sensors, and Bluetooth
- Smart Alzheimer’s Companion: Arduino-Based Alert System






